|
These logs are the logs of what each team member has done for the project. They are on a weekly basis. |
Other documents are posted on the Documents section. | |
First semester Logs (DOC): |
|
Log 1--Week 2: September 4 – September 10 Log 2--Week 3: September 11 – September 17 Log 3--Week 4: September 17 – September 24 Log 4--Week 5: September 24 – September 30 Log 5--Week 6: October 2 – October 8 Log 6--Week 7: October 16 – October 22 Log 7--Week 8: October 23 – October 29 Log 8--Week 9: October 30 – November 4 Second semester Logs: Aaron Chris Todd Mark Matt Status Reports: PPT Written January 23, 2006 PPT Written February 16, 2006 PPT Written March 21, 2006 PPT Written April 13, 2006 |