Project Status

written by jesse on September 12th, 2007 @ 04:31 PM

Requirements

  • High-level requirements flushed out (Team)
  • Requirements prioritization complete (Jesse)
  • Software Requirements Specification (Team)

Methodology

  • Project methodology established (Tony and Jesse)
  • Detailed project methodology specification sheet (Tony)
  • Communication process between client and team (Tony)

Risk Analysis

  • Identify high-level project risks (Team)
  • Document risk mitigation measures and residual risk (Ryan)

Web Page

  • Establish usable website to track project status (Justin)
  • Add biography section (Justin)
  • Team Logo (Tony)
  • Add time log section (Justin)
  • Add front page with project definition (Justin)
  • Add unanswered question section (Justin)

Reference Material

  • Update reference section with LaTeX cheat sheet (Ryan)
  • Add all emailed reference documents to web page (Ryan)

Research & Development

  • Read XBee Documentation (Team)
  • Establish communication between Unix and Windows system with XBees (Justin and Ryan) ~Update: no current driver support

Presentations

  • Translate project definition documentation into presentation (Team)
  • Create project plan presentation (Jesse)
  • Create signal strength demo (Justin, Ryan, and Tony)
  • Create project design presentation (Jesse)