subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

CS 425 - Sean's Logs

Month of September 2004

Date

Task

Time Spent(mins)

9/7/04

Project assigned, met with team for first time and exchanged contact information.

30

9/9/04

Meeting with team in class to discuss some initial ideas and impressions about the project

25

9/14/04

Meeting with team in class, discussed webpage and time logs

30

9/15/04

Worked on some questions for meeting with client Dr. Weinberg.

20

9/16/04

Meeting with Peri and Joe in class to discuss our questions for client meeting while Mike was in the managers meeting

15

9/16/04

Meeting with client Dr. Weinberg to discuss main focus of our project and get a better idea of what we will be doing. After meeting, we discussed some ideas and assigned roles.

115

9/20/04

Team meeting where we discussed team and project name. Also, held a brainstorming session for camera pan and tilt and zoom interface

120

9/21/04

Meeting with team in class, discussed a conflict resolution plan, and ethical considerations. Took pictures of team and individual shots for the webpage.

25

9/23/04

Meeting with team in class, discussed website, time logs, and documentation goals.

25

9/23/04

Meeting with our client, Mr. Lamonica to discuss the technical aspects of our project

75

9/27/04

Brainstorming session with team for ideas on the mapping features interface

73

9/28/04

Meeting with team in class to discuss some prototyping ideas.

25

9/30/04 Meeting with team in class to discuss our project definition presentation. We also talked about a Java IDE since we will need to learn/use Java for our project. We also talked about frame rate issues on the website.
30

 

Total
9.63hrs

 


Month Of October 2004

Date

Task

Time Spent(mins)

10/5/04

Meeting with team in class, discussed coming up with some prototypes and set up some milestones and due dates.

25

10/6/04

Met with Joe to design some prototypes for the mapping features.

90

10/6/04

Worked on a mapping hi-fi prototype in VB 6.0

90

10/7/04

Meeting in class where we met new team member Sean W. Explained to Sean W what we have been working on up to this point.

25

10/7/04

Controlled Taz to get a feel for things, then held a team meeting where we worked on our team presentation.

75

10/10/04

Worked on the content of the slides for group presentation.

30

10/11/04

Worked on PowerPoint slides and discussed who is presenting what information for the presentation.

30

10/11/04

Meeting with Joe to go over slides and prototypes

75

10/12/04

Meeting in class to talk about presentation stuff.

25

10/13/04

Joe and I met with client Dr. Weinberg to show and get feedback on some of our mapping feature prototypes

30

10/14/04

Team presentation, presented our problem definition and some design ideas to upper management and class

20

10/19/04

Meeting in class where we discussed system design and overall system architecture. We also talked about some things concerning the learning of Java

40

10/21/04

Meeting in class, talked about design aspects and the upcoming presentation on design

25

10/26/04

Meeting in class, talked more about the system architecture.

25

10/28/04

Meeting in class, talked about upcoming presentation

40

10/28/04

Meeting with team, talked about some Java things we are going to need to learn/work on, and talked about upcoming presentation

90

 

Total
12.25hrs

 


Month of November 2004

Date

Task

Time Spent(mins)

11/2/04

Meeting in class, discussed upcoming presentation

25

11/3/04

Met with Joe, worked on breaking the mapping feature into subsystems and modularizing. Also, talked to Mr. Lamonica about some technical aspects of the map (how info is stored and how we get access to it).

120

11/4/04

Meeting with team, continued working on aspects related to the upcoming presentation

120

11/4/04

Meeting with team, continued working on aspects related to the upcoming presentation

120

11/8/04

Worked individually and with team on making the slides for the presentation

120

11/9/04

Last minutes touches and somewhat of a practice run through of presentation

90

11/10/04

Played around with Eclipse and looked at some of the existing code.

90

11/16/04

Worked on a rough draft for the conflict resolution document

35

11/16/04

Typed out final draft of conflict resolution document

20

11/17/04

Read through chapters of a Java book about graphics in Java and the similarities and differences of Java and C++

90

11/18/04

Meeting with team, talked about documentation that still needs to be done, and ideas for presentation

25

11/18/04

Read Java book and learned about some of the graphics methods that will be needed for the mapping features

40

11/21/04

Read more of Java book, found some of the Java APIs and methods that will be helpful in our project

60

11/22/04

Worked on designing some practice applets and began working on a mapping applet

120

11/23/04

Continued to practice with applets

60

11/27/04

Read through a Java book concerning graphics in Java

30

11/29/04

Worked on slides for upcoming presentation

120

11/30/04

Worked on slides and java applet

90

 

 

 

 

Total
22.41hrs

 


 

Month of December 2004

Date

Task

Time Spent(mins)

12/1/04

Meeting with team, worked on project plan presentation

180

12/2/04

Meeting with team before presentation to put final touches on slides and run through the information we were presenting

90

12/3/04

Worked on programming a Java applet

60

12/7/04

Met with the team to discuss the final presentation

90

12/9/04

Met with team to discuss current status, final presentation, and attended J3R's final presentation to get a better idea on what to expect.

180

12/11/04

Proofread some of the documentation Sean W has been working on

60

12/13/04

Worked on slides for final presentation

60

 

Total
12 hrs

 

 