subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link | subglobal1 link
subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link | subglobal2 link
subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link | subglobal3 link
subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link | subglobal4 link
subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link | subglobal5 link
subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link | subglobal6 link
subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link | subglobal7 link
subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link | subglobal8 link

CS 425 - Mike's Logs

Month of September 2004

Date

Task

Time Spent (mins)

09/07/04

Projects and Team assigned. First meeting with team to introduce ourselves and exchange contact info.

30

09/07/04

Emailed requests for available times from entire team to schedule future meetings.

5

09/09/04

Team meeting in class. Discussed initial thoughts, ideas, impressions of assigned project.

25

09/10/04

Compiled list of available times of each team member to discuss at next meeting.

5

09/10/04

Emailed request to client (Dr. Weinberg) for meeting on 09/16/2004.

5

09/12/04

Email received from client (Dr. Weinberg), confirmation of 09/16/2004 1600 meeting in Senior Lab.

1

09/14/04

Team meeting in class. Elected Peri to handle Website operations. Meeting with client on Thurs.

30

09/15/04

Created some questions in preparation for 09/16/2004 1600 meeting with client (Dr. Weinberg).

15

09/16/04

Managers meeting during class time.

15

09/16/04

Team meeting in class (after Managers meeting) to relay relevent info to team: Webpages, Security Badges.

5

09/16/04

Meeting with client (Dr. Weinberg) to reveal more details of the project. Team meeting following to elect roles and discuss ideas.

112

09/20/04

Team meeting. Brainstorming session: camera pan/tilt/zoom interface and team name.

120

09/21/04

Team meeting in class. Discussed conflict resolution plan and ethical considerations. Peri has notes. Individual mugshots and team picture taken.

25

09/23/04

Emailed request for meeting with client (A. Lamonica).

5

09/23/04

Team meeting in class. Discussed website, time logs, and documentation goals. Possible meeting with Andrew Lamonica at 1600.

25

09/23/04

Meeting with client (A. Lamonica) to discuss technical details of project. Lots of technical info was discussed including: programming language of each software layer, existing architecture, current status of code, aria, sephira, access to source code, forming group home accounts(?) for each member. We got our work cutout for us.

75

09/27/04

Team meeting: Brainstorming session for mapping feature. Split group into two, Sean and Joe are handling the mapping, Peri and I are handling the camera controls.

75

09/28/04

Team meeting (in class): discussed group presentation

30

09/30/04

Team meeting in class: group presentation, design prototypes, Java IDE Eclipse, possible frame rate increase via multicast.

30

 

Total
12.71hrs

 

 


Month Of October 2004

Date

Task

Time Spent (mins)

10/04/04

Met with Peri. Worked on the camera control design.

180

10/05/04

Team meeting in class: screen mockups.

25

10/05/04

Team meeting: Presentations and new member Sean Williams discovered.

90

10/06/04

Met with Peri. Worked on camera control prototypes.

180

10/07/04

Team meeting in class: New team member Sean Williams introduced.

20

10/07/04

Team meeting: presentations next week. Talked to Andrew Lamonica about having access to Marvin's camera. Assigned Sean Williams to docs and testing. Presentation divided up among team.

75

10/12/04

Met with Peri. Worked on presentation slides for camera controls.

90

10/13/04

Presented initial camera control design ideas to the Client

30

10/19/04

Team meeting in class: Outlined our next step in the project. Discussion on the Design Presentation which is due in the second week of November. Sean Williams assigned to RAD.

40

10/15/04

Research on Java Graphics programming, first round of books on Java language ordered. Existing NORRT source code studied

120

10/22/04

Research on Java Applets and possible use of RMI in our project. Also, studied current system architecture to see how our system will integrate. Middleman server and Applet source code studied. Second round of books ordered.

180

10/28/04

Managers meeting during class time.

35

10/29/04

Research on Java network programming and revisit of some earlier ideas. Studied more Applet and Middleman source code. Third round of books ordered.

180

 

Total
20.75hrs

 

 


Month Of November 2004

11/10/04

Discussed project plan presentation

25

11/11/04

Team meeting: Documentation reqs and presentation.

60

11/16/04

Meeting with A. Lamonica, discussed current architecture.

120

11/18/04

Team meeting, presentation details, Thanksgiving break work schedule.

90

11/20/04

Researched Java applets

60

11/21/04

Researched Java network programming

90

11/22/04

Studied existing NORRT applet code

120

11/24/04

Studied existing NORRT middleman code

120

11/26/04

Studied existing NORRT applet and middleman code and made notes of project integration into existing architecture

180

11/29/04

Met with Peri and discussed presentation details and Gant chart.

60

11/30/04

Met with Peri and worked on presentation details.

180

 

Total
18.41hrs

 


Month Of December 2004

12/01/04

Worked on design and subsystem integration.

120

12/05/04

Met with Peri and worked on hi-fi prototype of web applet. Researched swing and awt differences and support.

600

12/06/04

Worked on possible swing prototype feasibility due to problems with layout.

120

12/07/04

Team meeting discussing final presentation.

90

12/09/04

Review of prototype and integration of map and controls.

60

12/12/04

More work on final presentation slides.

60

12/13/04

Presentation slide work.

120

 

Total
19.5hrs

About Us |Contact Us | ©2004 Team Evolution